The 135 mile Northeast Texas Trail from Farmersville, Texas to New Boston, Texas continues to take shape as this 9 mile section in Red River County is improved.

Our Solution

Hayter Engineering assisted Red River County in obtaining grant funds through the Texas Department of Transportation - Transportation Alternatives Program.

This extension of the NE Texas Trail connects to the Prairiland Trail extending from County Road 2113 through Detroit, Texas, to the east side of Bagwell, Texas, a distance of approximately 9 miles. The trail uses the abandoned Northeast Texas railroad corridor which is adjacent to US 82 and FM 2573 in Red River County.

This extension includes an at-grade crossing of US 82 with an asphalt trail along state right-of-way connecting to the railroad corridor.

Red River County Shared Use Trail is part of a Trail Master Plan that extends west to the Trail de Paris in Paris, Texas, and will in the future extend west to Farmersville, Texas which is approximately 75 miles from the City of Paris. The future NE Texas Trail east of Bagwell will extend to New Boston, Texas.

Improvements included:

  • 45,100 LF Trail grading

  • 2,089 LF Handrail

  • 1,363 LF Metal beam guard fence

  • 346 Reflective pavement markings

  • 620 LF Post and cable fence

  • 1,818 LF Bridge deck timber replacement

  • 48 EA Steel removable bollards

  • 1,642 SY Lime subgrade treatment

  • 132 TN Type D HMAC surface

  • 56 LF 12” & 15” Reinforced concrete pipe

Project Details

LOCATION

Red River County, Texas

CONSTRUCTION COST

$519,916.50

SERVICES PROVIDED

  • Application for Finance
  • Preliminary Engineering
  • Environmental Assessment
  • Design Surveys
  • Easements/ROW permits
  • Design Plans & Specifications