Our Solution
Hayter Engineering provided the engineering support for the City of Avery to successfully apply to the Texas Department of Rural Affairs, Community Development Block Grant program for a Disaster Relief Culvert Replacement Project.
Improvements
Improvements included one 36" HDPE at Fort Worth Street culvert drainage, rock, concrete plus headwall and end wall; one 24" HDPE at Austin Street culvert drainage, rock, concrete plus headwall and end wall; 30 LF of 18" HDPE on the south side of Nevada Street; two 42" x 6' LF HDPE extensions on existing pipe at the intersection of Austin and Nevada Street; 765 LF of grading ditches to drain and re- seed; a permanent rock gabion; erosion control; fence; rock berm; and eight object marker signs.
LOCATION
Avery, Texas
CONSTRUCTION COST
$71,030
SERVICES PROVIDED
Application for Finance
Cost Estimating
Design Surveys
Civil Design
Construction Plans & Specifications
Construction Bid & Award
Construction Review
Warranty Review
Record Drawings