Street reconstruction provides major improvement to US Highway 82 for retail petroleum plant.

Our Solution

Pecan Street runs north/south through the City of Bonham. This project extended Pecan Street from US Highway 82 North to Bicentennial Street. The Schlumberger Retail Petroleum Systems plant is located at the north end near Bicentennial street and a new driveway was constructed for the plant.

Improvements included approximately 11,418 SY of lime stabilized subgrade and 6” crushed aggregate base; approximately 9,700 SY of asphalt paving; 800 SF of concrete street section; 3,880 LF of concrete curb and gutter; 100 LF of 24” diameter RCP culvert at US 82 intersection; and one storm sewer inlet.

Project Details

LOCATION

Bonham, Texas

SERVICES PROVIDED

  • Preliminary Engineering
  • Easement / ROW Permits
  • Design Surveys
  • Design Plans & Specifications
  • Construction Bid & Award
  • Construction Review
  • Record Drawings
  • Warranty Review