In order to meet increasing product demand, Kimberly-Clark added parking for 195 semi-trailers and warehouse expansion.

Our Solution

Hayter Engineering designed a truck parking area approximately 500' x 500' for 195 vehicles south of the Kimberly-Clark Corporation plant.

This project included topographic surveys and mapping for Kimberly-Clark. In addition, Hayter Engineering provided design and drawings for their warehouse expansion.

Work Included:

  1. Review of site utilities and survey to locate building corners and loading dock elevations
  2. Water and sewer design including relocation of fire lines, service to the new 6500 SF office area and restroom in the new warehouse
  3. Facilities for the disposal of the roof drain water and drainage design
  4. Perimeter road design
  5. Electrical grounding grid design.
Project Details

LOCATION

Paris, Texas

ENGINEERING SERVICES COST

$16,900.00

SERVICES PROVIDED

Design
Design Surveys Mapping
Construction Standards & Technical Specifications