Our Solution
Hayter Engineering designed a truck parking area approximately 500' x 500' for 195 vehicles south of the Kimberly-Clark Corporation plant.
This project included topographic surveys and mapping for Kimberly-Clark. In addition, Hayter Engineering provided design and drawings for their warehouse expansion.
Work Included:
- Review of site utilities and survey to locate building corners and loading dock elevations
- Water and sewer design including relocation of fire lines, service to the new 6500 SF office area and restroom in the new warehouse
- Facilities for the disposal of the roof drain water and drainage design
- Perimeter road design
- Electrical grounding grid design.
Project Details
LOCATION
Paris, Texas
ENGINEERING SERVICES COST
$16,900.00
SERVICES PROVIDED
Design
Design Surveys Mapping
Construction Standards & Technical Specifications