Major improvements to access Lake Bob Sandlin, Titus County, Texas.

Our Solution

Hayter Engineering assisted the Titus County Fresh Water District No. 1 to obtain a grant from the Texas Parks & Wildlife Department from their Boating Access Grant Program.

This grant was funded with $292,500 in state funds which was 75% of the original project cost of $390,000. Improvements included a new 32 foot wide, two lane concrete boat ramp located along Ft. Sherman Dam Road on the eastern educe of Lake Bob Sandlin; a new fixed dock and sidewalks, parking lot and entrance road and new rest rooms.

Change Orders added 5 inch thick concrete instead of 6 inch rock and 2 inch asphalt on the parking lot and entrance road, a vinyl retaining wall to prevent soil erosion into the lake, and various added improvements to the restroom building and lighting facilities.

Project Details

LOCATION

Lake Bob Sandlin, Titus County, Texas

CONSTRUCTION COST

$584,612.97

SERVICES PROVIDED

  • Application for Finance
  • Preliminary Engineering
  • Design
  • Design Surveys
  • Construction Bid & Award
  • Construction Review
  • TDLR Inspection
  • Warranty Review