Our Solution
Hayter Engineering provided analysis, design, and construction review of a roadway crossing that was washed out during a mAY 2015 storm event. The project involved coordination with TxDOT through the Federal Highway Administration’s Emergency Relief funding program.
In addition, Hayter Engineering performed a detailed hydrologic and hydraulic analysis of the channel and roadway crossing, analyzed and recommended improvement alternatives, developed TxDOT approved construction plans and specifications for the 6’ x 5’ culverts, and performed construction review activities in accordance with TxDOT’s Local Government Project Procedures during the construction of the project.
Project Details
LOCATION
Bonham, Texas
CONSTRUCTION COST
$160,030
SERVICES PROVIDED
- Application for Finance
- Preliminary Engineering Report
- Hydrologic and Hydraulic Modeling
- Cost Estimating
- Design Surveying
- Civil Design
- Construction Plans & Specifications
- Construction Bid & Award
- Construction Review
- Materials Testing
- Record Drawings