The 1.8 mile long main interceptor from the collection system to the wastewater treatment plant was replaced along with installing 500 gallon per minute package lift stations at two key locations.

Our Solution

The project addressed excessive infiltration/inflow and assisted in eliminating overflows by replacing an aged, deteriorated clay pipe collection line. System overflows were reduced by replacing existing deteriorated lift station equipment at the north and south lift stations.

Improvements included:

  • 38 new manholes and 4 replacement manholes
  • 9,333 LF 24" and 3,111 LF of 21" PVC closed profile gravity
  • sewer
  • 2,983 LF asphalt/drive street repair
  • South lift station wetwell rehabilitation
  • Package south lift station and package north lift station (2 EA
  • 500 gpm in each) installed with concrete pad, yard piping and
  • site work
  • SCADA controls/programming for both lift stations
  • Drainage modifications
Project Details

LOCATION

Bonham, Texas

CONSTRUCTION COST

$1,805,262.39

SERVICES PROVIDED

Application for Finance
Preliminary Engineering
Design Surveying
Electrical Engineering
Civil Engineering
Design Plans & Specifications
Easements/ROW permits
Environmental Assessment
Geotechnical Procurement
Discharge Permit
Construction Bid & Award
Construction Review
Materials Testing
Record Drawings
Warranty Review